Skip to the main content
The Crier

Build of a Construction to Cover an Existing Swimming Pool

Your saved contracts

What the buyer wrote

Sheen Mount Primary School (The "School") is inviting tenders from suitably experienced and qualified contractors for the provision of a construction to cover an existing swimming pool. The surrounds of the existing concrete swimming pool are to be increased in height to obtain a depth of 1.2m, up from a current depth of 1m. This intervention will require the installation of a waterproof liner. 2.6 The building needs to be a timber structure, approx. 18.5m x 9.5m in size. It needs to contain two changing room areas, a shower room and accessible toilet.

Bid for this and lost? There is a short window in which the decision can be questioned.

Awarded to

Buckland Pool and Building Company£372kends (28 Feb 2020)

Details

What the buyer calls it
Build of a Construction to Cover an Existing Swimming Pool
How they are buying
Advertised, open to anyoneAny supplier could bid without being invited first.
Type
works
Suitable for small firms
The buyer says yes. What that is worth
Work starts
19 Sep 2019
Work ends
28 Feb 2020
Kind of work
Construction

Who the buyer named

Carolyn Moore was the named contact on this notice.

info@sheenmount.richmond.sch.uk