What the buyer wrote
Design - Obtain listed planning consent for the replacement of 160 windows at ground, first, second and third floor levels on the northern and southern elevations of C Wing at HMP Lewes. The replacement windows will provide upgraded security negating the requirement for external security meshing. They will be identical dimensionally to those existing, therefore not affecting the existing brick quoins and arches. Frame colour will be matched to existing. Survey C Wing and create scope of work that itemises the remedial works required to each room, post window removal / installation. To facilitate the planning application the design(s) shall be taken from RIBA Stage 1 – 4. To view this notice,…
Bid for this and lost? There is a short window in which the decision can be questioned.
Awarded to
Details
- What the buyer calls it
- C Wing Cell Window Replacements - Design
- How they are buying
- Quotes from a few suppliersThe buyer approached a small number directly rather than advertising it.
- Work starts
- 25 Sep 2025
- Work ends
- 5 Dec 2025
- Where
- in London
- Kind of work
- Architecture and design
Who the buyer named
The buyer published a contact address on this notice.
