Skip to the main content
The Crier

Call off from TD1191 DCC Highways Maintenance Framework Lot 21 Structures (Alfreton Road Bridge Re-strengthening Works).

Your saved contracts

What the buyer wrote

Alfreton Road Bridge Re-strengthening Works

Bid for this and lost? There is a short window in which the decision can be questioned.

Awarded to

Eurovia Infrastructure Ltd£394kends (31 Mar 2019)

Details

What the buyer calls it
Call off from TD1191 DCC Highways Maintenance Framework Lot 21 Structures (Alfreton Road Bridge Re-strengthening Works).
How they are buying
Called off an existing agreementThe work went to a supplier already on a framework or dynamic market.
Type
works
Work starts
19 Nov 2018
Work ends
31 Mar 2019

Who the buyer named

Pete Howell was the named contact on this notice.

pete.howell@derbyhomes.org