Cawood Swing Bridge Strengthening And Repainting
What the buyer wrote
Works are to strengthen the existing transverse members by attaching a new steel plate to the underside of the transverse member and re-attaching the existing plate. Other works are to repaint to existing colour the whole of the structure including some minor steel work repairs.
Bid for this and lost? There is a short window in which the decision can be questioned.
Awarded to
Details
- What the buyer calls it
- Cawood Swing Bridge Strengthening And Repainting
- How they are buying
- Given to one supplier, no competitionNobody else was asked, and the buyer has to be able to justify that.
- Type
- works
- Work starts
- 15 Jun 2017
- Work ends
- 4 Sep 2017
- Kind of work
- Civil engineering and groundworks
Who the buyer named
Alison Dickinson was the named contact on this notice.
