Cdel/Kas/Dow 3/24/15332 - Workshop Refurbishment Works-Design Itt
What the buyer wrote
A feasibility study will be conducted to evaluate the current condition and functionality of the following facilities: Workshop 1 at London Fashion College The Main Store and the relocation of existing storage facilities to the area adjacent to the E Wing, where portacabins will be installed to accommodate the stores The Psychology Unit and the relocation of the Psychology Team to a newly obtained portacabin, situated in the external space adjacent to C Wing The Education Building – Hairdressing Classroom The purpose of this study is to evaluate the current condition of the facilities, assess the viability of services, and undertake comparative analyses. The study will determine the necessar…
Bid for this and lost? There is a short window in which the decision can be questioned.
Awarded to
Details
- What the buyer calls it
- Cdel/Kas/Dow 3/24/15332 - Workshop Refurbishment Works-Design Itt
- How they are buying
- Quotes from a few suppliersThe buyer approached a small number directly rather than advertising it.
- Work starts
- 25 Aug 2025
- Work ends
- 18 Nov 2025
- Where
- in London
Who the buyer named
The buyer published a contact address on this notice.
