Skip to the main content
The Crier

Ceiling repairs

Your saved contracts

What the buyer wrote

Grade II* listed building with deterioration of the Barlow Rails (Barlow Rails were a rolled rail section originally used in railways in the 19th Century, they were not suitable for the railway so were used in construction for joists). The Barlow Rails are heavily corroded with loose delaminated metal which is able to be pulled away by hand, as they have rusted they have sufficient force to split and lift masonry. Cracks are present across encaustic tiled floor above the cellar and in the surrounding walls. The expansion of the rails and subsequent movement of the floor has distorted non-structural partitions including doors. The Barlow Rails have reached the end of their life, these ar…

Read all of it on Contracts Finder →

Details

What the buyer calls it
Ceiling repairs
How they are buying
Given to one supplier, no competitionNobody else was asked, and the buyer has to be able to justify that.
Type
works
Suitable for small firms
The buyer says yes. What that is worth
Work starts
1 Nov 2020
Work ends
31 Mar 2021
Kind of work
Construction

Who the buyer named

Claire Sheppard was the named contact on this notice.

claire@harveysfoundrytrust.org.uk