What the buyer wrote
The supply and installation of 10 mm plywood to ceilings along with 4" x 2" brackets to a cloud design, is required for all offices on the Gr. Floor The installation of covers, strips and two coats of paint is also necessary. Finally, 200 mm holes must be cut to accommodate the luminaires, which are to be supplied by a third party.
Bid for this and lost? There is a short window in which the decision can be questioned.
Awarded to
Details
- What the buyer calls it
- Ceiling Works
- How they are buying
- The buyer did not say
- Where
- in London
Who the buyer named
Ben Higgs was the named contact on this notice.
