Christopher Ingold Building 1st Floor Labortaory 129 Alterations
What the buyer wrote
Refurbishment of existing laboratory space at 1st floor, UCL Christopher Ingold Building, 20 Gordon Street, London WC1H 0AJ. Refurbishment works required to the 1st floor of the Christopher Ingold Building in room 129. • The following works will include a contractors design portion; medical gas line instillation. • A list of approved firms to carry out the services installation is included in Appendix C, however it is the Contractor's responsibility to ensure they have sufficient resources to carry out the works over the proposed construction programme. • Normal UCL Permit to works and notice periods will be required to specific works as referred to in Fowler Martin's Specfication…
Bid for this and lost? There is a short window in which the decision can be questioned.
Awarded to
Details
- What the buyer calls it
- Christopher Ingold Building 1st Floor Labortaory 129 Alterations
- How they are buying
- The buyer did not say
- Type
- works
- Work starts
- 22 May 2016
- Work ends
- 23 Sep 2016
Who the buyer named
The buyer published a contact address on this notice.
