Church Hill (C36.01) & Stagg Hill (C44.01) Culvert Repair Works
What the buyer wrote
Church Hill (C36.01) Culvert Repair Works Break out existing manhole cover & frame & replace with new. Break out existing step irons & replace with five new step irons & make good to chamber wall. Cut out tree roots from the invert of precast concrete culvert units & dispose of. Pack base of scoured abutment wall with concrete. Remove logs blocking main inlet pipe. Concrete repair to main & other inlet pipes. Repair spalling of soffit to precast concrete culvert units due to reinforcing bar corrosion. Repair to brick culvert soffit damage. Pack downstream end of culvert units with concrete filled sandbags. All work to be classified as confined spaces. Stagg Hill (C44.01) Culvert Repair Works…
Bid for this and lost? There is a short window in which the decision can be questioned.
Awarded to
Details
- What the buyer calls it
- Church Hill (C36.01) & Stagg Hill (C44.01) Culvert Repair Works
- How they are buying
- Advertised, open to anyoneAny supplier could bid without being invited first.
- Type
- works
- Work starts
- 4 Nov 2019
- Work ends
- 29 Nov 2019
- Kind of work
- Construction, Water, drainage and flood management
Who the buyer named
Mr Aaron John was the named contact on this notice.