Skip to the main content
The Crier

City Centre District Energy Investigation Works

Your saved contracts

What the buyer wrote

The main purpose of the work is to assess the efficiency/feasibility of a groundwater based open loop heating/cooling system for the Civic Centre development. This process will include the installation of groundwater wells suitable for the abstraction and injection/absorption of groundwater. It is proposed to undertake a phased investigation to provide a cost effective investigation of the groundwater beneath the site. This will ensure that preliminary results are assessed as to the feasibility of the project at an early stage. The Works are planned to consist of three main phases.

Bid for this and lost? There is a short window in which the decision can be questioned.

Awarded to

Project Dewatering£487.7kends (22 Nov 2019)

Details

What the buyer calls it
City Centre District Energy Investigation Works
How they are buying
The buyer did not say
Type
works
Suitable for small firms
The buyer says yes. What that is worth
Work starts
9 Jun 2019
Work ends
22 Nov 2019

Who the buyer named

John Collins was the named contact on this notice.

john.collins2@plymouth.gov.uk