What the buyer wrote
The main purpose of the work is to assess the efficiency/feasibility of a groundwater based open loop heating/cooling system for the Civic Centre development. This process will include the installation of groundwater wells suitable for the abstraction and injection/absorption of groundwater. It is proposed to undertake a phased investigation to provide a cost effective investigation of the groundwater beneath the site. This will ensure that preliminary results are assessed as to the feasibility of the project at an early stage. The Works are planned to consist of three main phases.
Bid for this and lost? There is a short window in which the decision can be questioned.
Awarded to
Details
- What the buyer calls it
- City Centre District Energy Investigation Works
- How they are buying
- The buyer did not say
- Type
- works
- Suitable for small firms
- The buyer says yes. What that is worth
- Work starts
- 9 Jun 2019
- Work ends
- 22 Nov 2019
Who the buyer named
John Collins was the named contact on this notice.
