Clacton Leisure Centre Oil Boiler Replacement and Installation of New Solar PV's
What the buyer wrote
Project Objective The project aims to replace the existing end-of-life oil boiler system at Clacton Leisure Centre with a modern, low-carbon heating solution and and Installation of New Solar PV's. This is part of Tendring District Council's broader decarbonisation strategy and is supported by a successful PSDS Phase 4 grant application. Scope of Works Please review the specifications for the proposed works. Key Considerations The project is time-sensitive due to the failure of one of the existing boilers and the requirement to draw down most of Salix funding within the 2025/26 financial year. All works must be completed and commissioned by April/May 2026 to meet grant conditions. The projec…
Bid for this and lost? There is a short window in which the decision can be questioned.
Awarded to
Details
- What the buyer calls it
- Clacton Leisure Centre Oil Boiler Replacement and Installation of New Solar PV's
- How they are buying
- Advertised, open to anyoneAny supplier could bid without being invited first.
- Type
- works
- Work starts
- 19 Dec 2025
- Work ends
- 30 Nov 2026
- Where
- in the East of England
Who the buyer named
The buyer published a contact address on this notice. Questions closed on 24 Oct 2025, 23:59 BST.
