Skip to the main content
The Crier

Cleveland Pools Mechanical and Electrical Engineer

Your saved contracts

What the buyer wrote

Background The Cleveland Pools Trust Ltd have received a funding award from HLF to develop the exciting project of re-opening the existing outdoor Georgian bathing Pool in Bath, which was originally built in 1815. The site is listed grade II* and is part of the Bath World Heritage Site. The site was last used for swimming in the mid 1980’s and is thought to be the oldest purpose designed Lido in the UK, possibly Europe. The project has evolved from the efforts of a committed local group who have fought to bring the site back into use as a naturally water treated open air swimming facility to serve the local community, adding a new dimension to Baths tourist offer away from the core of th…

Read all of it on Contracts Finder →

Details

What the buyer calls it
Cleveland Pools Mechanical and Electrical Engineer
How they are buying
The buyer did not say
Suitable for small firms
The buyer says yes. What that is worth
Work starts
19 Aug 2015
Work ends
1 Dec 2017

Who the buyer named

Christopher Heath was the named contact on this notice.

Christopher@ClevelandPools.org.uk