Skip to the main content
The Crier

Cliff Cottage Culvert (A170) Maintenance 2019

Your saved contracts

What the buyer wrote

Eastern (Cliffe Cottage) culvert - Grout under 4no parapet bases. Saw cut, clean and repair appox 250 x 150 mm damaged concrete from culvert inlet face. Clean & repair approx 300 x 300mm section of damaged concrete from culvert interior wall. Rake out, clean & fill 5x small holes on culvert inlet face. Clear and remove vegetation from downstream end wingwalls to a distance not less than 1.5m out from structure. Clear off and remove vegetation & debris from verges. Remove previously tipped branches & cuttings. Sinnington Seven bridge - remove grass, soil and vegetation growing on both verges. Hand cut and remove vegetation growing over service pipe on downstream side of bridge. Remove veg…

Read all of it on Contracts Finder →

Bid for this and lost? There is a short window in which the decision can be questioned.

Awarded to

Hall Construction Services£12.8kends (23 Aug 2019)

Details

What the buyer calls it
Cliff Cottage Culvert (A170) Maintenance 2019
How they are buying
Advertised, shortlist firstSuppliers applied to be considered, and the buyer picked who went on to bid.
Type
works
Suitable for small firms
The buyer says yes. What that is worth
Work starts
11 Aug 2019
Work ends
23 Aug 2019

Who the buyer named

Alison Dickinson was the named contact on this notice.

alison.dickinson@northyorks.gov.uk