Cliff Cottage Culvert (A170) Maintenance 2019
What the buyer wrote
Eastern (Cliffe Cottage) culvert - Grout under 4no parapet bases. Saw cut, clean and repair appox 250 x 150 mm damaged concrete from culvert inlet face. Clean & repair approx 300 x 300mm section of damaged concrete from culvert interior wall. Rake out, clean & fill 5x small holes on culvert inlet face. Clear and remove vegetation from downstream end wingwalls to a distance not less than 1.5m out from structure. Clear off and remove vegetation & debris from verges. Remove previously tipped branches & cuttings. Sinnington Seven bridge - remove grass, soil and vegetation growing on both verges. Hand cut and remove vegetation growing over service pipe on downstream side of bridge. Remove veg…
Bid for this and lost? There is a short window in which the decision can be questioned.
Awarded to
Details
- What the buyer calls it
- Cliff Cottage Culvert (A170) Maintenance 2019
- How they are buying
- Advertised, shortlist firstSuppliers applied to be considered, and the buyer picked who went on to bid.
- Type
- works
- Suitable for small firms
- The buyer says yes. What that is worth
- Work starts
- 11 Aug 2019
- Work ends
- 23 Aug 2019