Condensate Water Pipework System - Quantity Surveyor
What the buyer wrote
The project entails the replacement of existing Condenser Water pipework system with new. This pipework runs from the Ground to the 30th floor of Guy’s Tower. The project will need to be undertaken in two phases to ensure that cooling is available to the site at all times to the Hospital. The existing Condenser Water pipework provides the heat rejection for the existing Daikin Applied centrifugal chillers consisting of two 1.7 MW packaged centrifugal chillers reference 1A/1B (System 1) and one 3.4 MW packaged centrifugal chiller reference 2 (System 2) located within the Ground floor plantroom adjacent the main hospital entrance. The existing system is designed to allow for one system to oper…
Bid for this and lost? There is a short window in which the decision can be questioned.
Awarded to
Details
- What the buyer calls it
- Condensate Water Pipework System - Quantity Surveyor
- How they are buying
- Quotes from a few suppliersThe buyer approached a small number directly rather than advertising it.
- Work starts
- 25 Sep 2025
- Work ends
- 31 Dec 2026
- Where
- in London