The project entails the replacement of existing Condenser Water pipework system with new. This pipework runs from the Ground to the 30th floor of Guy’s Tower. The project will need to be undertaken in two phases to ensure that cooling is available to the site at all times to the Hospital. The existing Condenser Water pipework provides the heat rejection for the existing Daikin Applied centrifugal chillers consisting of two 1.7 MW packaged centrifugal chillers reference 1A/1B (System 1) and one 3.4 MW packaged centrifugal chiller reference 2 (System 2) located within the Ground floor plantroom adjacent the main hospital entrance. The existing system is designed to allow for one system to oper…

Read all of it on Find a Tender →

Bid for this and lost? There is a short window in which the decision can be questioned.

Awarded to

Oander Limited£37kends (31 Dec 2026)

Details

What the buyer calls it
Condensate Water Pipework System - Quantity Surveyor
How they are buying
Quotes from a few suppliersThe buyer approached a small number directly rather than advertising it.
Work starts
25 Sep 2025
Work ends
31 Dec 2026
Where
in London

Who the buyer named

The buyer published a contact address on this notice.