Construction of a Minewater Treatment facility at Nent Haggs
What the buyer wrote
The works are the construction of a mine water treatment scheme at Nent Haggs. The works include • The provision of a site compound for the duration of the works and the reinstatement of the site compound site following completion of the works, • The construction of a capture structure to capture the raw mine water at source (the capture point), • The design of a rising main to transfer the mine water from the pumping station to the treatment site (the transfer route), • The construction of gravity pipework and rising mains to transfer the raw mine water from the capture point to site 4 (the treatment site), • The construction of a pumping station on site 38 (the pumping station site), …
Bid for this and lost? There is a short window in which the decision can be questioned.
Awarded to
Details
- What the buyer calls it
- Construction of a Minewater Treatment facility at Nent Haggs
- How they are buying
- Advertised, shortlist firstSuppliers applied to be considered, and the buyer picked who went on to bid.
- Type
- works
- Suitable for small firms
- The buyer says yes. What that is worth
- Work starts
- 30 Sep 2019
- Work ends
- 31 Mar 2022
Who the buyer named
Peter Kobryn was the named contact on this notice.