Construction of a Minewater Treatment facility at Nent Haggs

Your saved contracts

What the buyer wrote

The works are the construction of a mine water treatment scheme at Nent Haggs. The works include • The provision of a site compound for the duration of the works and the reinstatement of the site compound site following completion of the works, • The construction of a capture structure to capture the raw mine water at source (the capture point), • The design of a rising main to transfer the mine water from the pumping station to the treatment site (the transfer route), • The construction of gravity pipework and rising mains to transfer the raw mine water from the capture point to site 4 (the treatment site), • The construction of a pumping station on site 38 (the pumping station site), …

Read all of it on Contracts Finder →

Bid for this and lost? There is a short window in which the decision can be questioned.

Awarded to

I&H Brown£5.3mends (31 Mar 2022)

Details

What the buyer calls it
Construction of a Minewater Treatment facility at Nent Haggs
How they are buying
Advertised, shortlist firstSuppliers applied to be considered, and the buyer picked who went on to bid.
Type
works
Suitable for small firms
The buyer says yes. What that is worth
Work starts
30 Sep 2019
Work ends
31 Mar 2022

Who the buyer named

Peter Kobryn was the named contact on this notice.