Construction of a two storey courtyard infill extension at Bishop Justus Church of England School
What the buyer wrote
Construction of a two storey courtyard infill extension at Bishop Justus Church of England School, Magpie Hall Lane, Bromley, BR2 8HZ for The London Borough of Bromley. The proposed works are shown on the existing and proposed drawings issued with the PQQ. The extension will comprise four General Teaching Rooms constructed over part of an existing courtyard, with two on the ground floor (56m2 and 50m2) and two on the first floor (56m2 and 65m2), accessed from an existing corridor. The existing school building was constructed in 2004. The contractor’s works will include completion of the detailed design beyond RIBA Stage 4, and construction of the extension under the JCT Design & …
Details
- What the buyer calls it
- Construction of a two storey courtyard infill extension at Bishop Justus Church of England School
- How they are buying
- Advertised, shortlist firstSuppliers applied to be considered, and the buyer picked who went on to bid.
- Type
- works
- Suitable for small firms
- The buyer says yes. What that is worth
- Work starts
- 30 Apr 2016
- Work ends
- 30 Oct 2016
- Kind of work
- New build construction, Architecture and design
Who the buyer named
Carol Fletcher was the named contact on this notice.
