Skip to the main content
The Crier

Construction of a two storey courtyard infill extension at Bishop Justus Church of England School

Your saved contracts

What the buyer wrote

Construction of a two storey courtyard infill extension at Bishop Justus Church of England School, Magpie Hall Lane, Bromley, BR2 8HZ for The London Borough of Bromley. The proposed works are shown on the existing and proposed drawings issued with the PQQ. The extension will comprise four General Teaching Rooms constructed over part of an existing courtyard, with two on the ground floor (56m2 and 50m2) and two on the first floor (56m2 and 65m2), accessed from an existing corridor. The existing school building was constructed in 2004. The contractor’s works will include completion of the detailed design beyond RIBA Stage 4, and construction of the extension under the JCT Design & …

Read all of it on Contracts Finder →

Details

What the buyer calls it
Construction of a two storey courtyard infill extension at Bishop Justus Church of England School
How they are buying
Advertised, shortlist firstSuppliers applied to be considered, and the buyer picked who went on to bid.
Type
works
Suitable for small firms
The buyer says yes. What that is worth
Work starts
30 Apr 2016
Work ends
30 Oct 2016

Who the buyer named

Carol Fletcher was the named contact on this notice.

echs.contractsteam@bromley.gov.uk