Construction of Beach Lodges for Manor Steps Phase Two

Your saved contracts

What the buyer wrote

Bournemouth Borough Council is seeking to appoint a contractor to construct 10 Beach Lodges (including 1 as an office) as part of the Phase 2 Manor Steps project. Manor Steps is situated 800 metres east of Boscombe Pier. Accessible via Boscombe Pier, or a short stroll down the cliff zig-zag path from Boscombe Overcliff Drive. The Beach Lodges will be an addition to the 15 lodges that are already onsite and fully operational. The initial 15 lodges (Phase 1) have been in operation since April 2017 and since opening have been hugely popular, for much of summer 2017 they operated at 100% capacity. The Council require a contractor to build the ten beach lodges offsite as per specification…

Read all of it on Contracts Finder →

Bid for this and lost? There is a short window in which the decision can be questioned.

Awarded to

Iform UK£392.8kends (28 Feb 2019)

Details

What the buyer calls it
Construction of Beach Lodges for Manor Steps Phase Two
How they are buying
Advertised, open to anyoneAny supplier could bid without being invited first.
Type
works
Suitable for small firms
The buyer says yes. What that is worth
Work starts
31 Jul 2018
Work ends
28 Feb 2019

Who the buyer named

Strategic Procurement Team was the named contact on this notice.