Construction of Highcliffe Castle Zig Zag Ramp Replacement
What the buyer wrote
Highcliffe Castle zig zag ramp provides pedestrian access between Highcliffe Castle and Highcliffe Beach. The scheme involves the replacement of the existing ramp which currently closed to the public due to a partial ramp collapse. The work will involve the demolition and removal of the existing timber revetment and path. The new path will be constructed using a steel king post system infilled with concrete panels faced with reclaimed prepared groyne timber. Work will include the reconstruction and resurfacing of the ramp surface and installation of associated furniture items. The successful supplier will be expected to commence the works on 9 November 2018. The supplier will be required …
Bid for this and lost? There is a short window in which the decision can be questioned.
Awarded to
Details
- What the buyer calls it
- Construction of Highcliffe Castle Zig Zag Ramp Replacement
- How they are buying
- Advertised, open to anyoneAny supplier could bid without being invited first.
- Type
- works
- Suitable for small firms
- The buyer says yes. What that is worth
- Work starts
- 9 Nov 2018
- Work ends
- 18 Apr 2019
Who the buyer named
Procurement Team was the named contact on this notice.
