Construction of Sustainable Drainage Systems (SuDS) in Schools (London Borough of Sutton)
What the buyer wrote
The London Borough of Sutton (LBS), together with the South East Rivers Trust, is undertaking a 'Sutton's SuDS in Schools' project. The project aims to reduce flood risk to 46 properties in the downstream catchment, attenuate 4.2 hectares, and reduce or remove playground flooding in the schools. This project is broken down into four phases: Phase 1 - initial scoping Phase 2 - design Phase 3 - school-specific fine tuning of the designs and construction of SuDS in three schools during the schools summer holidays 2019 Phase 4 - school-specific fine tuning of the designs and construction of SuDS in four educational establishments during the school summer holidays 2020 Londo…
Details
- What the buyer calls it
- Construction of Sustainable Drainage Systems (SuDS) in Schools (London Borough of Sutton)
- How they are buying
- Advertised, open to anyoneAny supplier could bid without being invited first.
- Type
- works
- Suitable for small firms
- The buyer says yes. What that is worth
- Work starts
- 30 Apr 2019
- Work ends
- 31 Oct 2019
Who the buyer named
Sharon King-Holmes was the named contact on this notice.
