Skip to the main content
The Crier

Construction of Sustainable Drainage Systems (SuDS) in Schools (London Borough of Sutton)

Your saved contracts

What the buyer wrote

The London Borough of Sutton (LBS), together with the South East Rivers Trust, is undertaking a 'Sutton's SuDS in Schools' project. The project aims to reduce flood risk to 46 properties in the downstream catchment, attenuate 4.2 hectares, and reduce or remove playground flooding in the schools. This project is broken down into four phases: Phase 1 - initial scoping Phase 2 - design Phase 3 - school-specific fine tuning of the designs and construction of SuDS in three schools during the schools summer holidays 2019 Phase 4 - school-specific fine tuning of the designs and construction of SuDS in four educational establishments during the school summer holidays 2020 Londo…

Read all of it on Contracts Finder →

Details

What the buyer calls it
Construction of Sustainable Drainage Systems (SuDS) in Schools (London Borough of Sutton)
How they are buying
Advertised, open to anyoneAny supplier could bid without being invited first.
Type
works
Suitable for small firms
The buyer says yes. What that is worth
Work starts
30 Apr 2019
Work ends
31 Oct 2019

Who the buyer named

Sharon King-Holmes was the named contact on this notice.

sharon.king-holmes@sutton.gov.uk