Contract for the design of upgrades to the power, steam, and the Building Management System along with the design of a hazardous waste incinerator at Weybridge
What the buyer wrote
The work covered by this contract will be defined by the WSP Design Study ("Weybridge Consilidation Programme Contract"). It is expected to cover areas such as: - Detailed design of the new solution to ensure compliance with the Weybridge operating license - Installation of interim incinerations solution to support the site requirements during design and installation of end state - Implementation of containised rotary UPS/Generators, allowing large rationalisation of current provision - Updating the high voltage ring to increase resilience - The replacement of broken or aging electrical infrastructure throughout the site - The implementation of consistent water treatment facilities …
Bid for this and lost? There is a short window in which the decision can be questioned.
Awarded to
Details
- What the buyer calls it
- Contract for the design of upgrades to the power, steam, and the Building Management System along with the design of a hazardous waste incinerator at Weybridge
- How they are buying
- The buyer did not say
- Type
- services
- Suitable for small firms
- The buyer says yes. What that is worth
- Work starts
- 9 Jan 2017
- Work ends
- 8 Jan 2022
Who the buyer named
The buyer published a contact address on this notice.
