Skip to the main content
The Crier

Contract for the supply and installation of OEM Hot Zone to the University of Birmingham

Your saved contracts

What the buyer wrote

Instillation and Commissioning : remove the existing Promat Hot Zone & reinstate the original OEM Hot Zone along with Shutter Valve, VIP etc and tested. VFE to supply labour only in order to fully commission the Control System including Single Crystal function & reinstate the original water cooled system etc and tested. VFE to supply & fit new type "K" mineral insulated transitions with vacuum fittings, suitably terminated. VFE to replace existing water hoses on the furnace (except for the one's which have been recently replaced) and re-hose the existing VIP water cooled power cables.

Bid for this and lost? There is a short window in which the decision can be questioned.

Awarded to

Vacuum Furnace Engineering£51.3kends (24 Apr 2020)

Details

What the buyer calls it
Contract for the supply and installation of OEM Hot Zone to the University of Birmingham
How they are buying
Given to one supplier, no competitionNobody else was asked, and the buyer has to be able to justify that.
Type
services
Work starts
25 Mar 2020
Work ends
24 Apr 2020

Who the buyer named

Louise Stanwell-Jones was the named contact on this notice.

l.a.stanwell-jones@bham.ac.uk