What the buyer wrote
1.1. This project includes, but is not limited to the following packages of work: • A new circa 700 Ml/d High Lift Pumping Station (HLPS) • A new circa 260 Ml/d Slow Sand Filter (SSF) Recirculation and Run-to-Waste system • A new cryptosporidium treatment system to treat SSF filtrate for Cryptosporidium inactivation* • A new circa 50 Ml/d contact tank draindown pumping station and dechlorination system* An overview of each of these packages and general requirements are provided in the Sections below. *Note: Thames Water is currently developing the requirements for these elements of scope and may decide to remove them from the scope of works or delay delivery of them following contract award,…
Bid for this and lost? There is a short window in which the decision can be questioned.
Awarded to
Details
- What the buyer calls it
- Coppermills WS-SRP Procurement
- How they are buying
- Advertised, then negotiatedThe buyer talked terms with bidders rather than taking fixed offers.
- Type
- works
- Where
- in London, in the South East
Who the buyer named
The buyer published a contact address on this notice.
