Countywide Planned and Reactive Work Installation of Replacement footway and bridleway bridges on the Worcestershire Public Rights of Way Network 2022 - 2026
What the buyer wrote
Worcestershire County Council has the statutory responsibility to ensure that the county's public rights of way network is properly mapped and maintained and the network is unobstructed and available for use by the public. An important part of the Council's work is replacing pedestrian foot and bridle bridges across the public rights of way network. This work is divided into two Geographical Areas, North and South, see Schedule 3. The number and sizes of bridges replaced each year can vary but is typically between 25 and 45 across the county, by far the majority of these are footbridges and it is generally evenly split between North and South. In most cases these are following reports fro…
Bid for this and lost? There is a short window in which the decision can be questioned.
Details
- What the buyer calls it
- Countywide Planned and Reactive Work Installation of Replacement footway and bridleway bridges on the Worcestershire Public Rights of Way Network 2022 - 2026
- How they are buying
- Advertised, open to anyoneAny supplier could bid without being invited first.
- Type
- works
- Lots
- 2
- Where
- in the West Midlands
Who the buyer named
Alison Atkinson was the named contact on this notice.