Skip to the main content
The Crier

COV - Cafe fit out at 31 Far gosford street and replacement sash windows and general maintenance works at 2 Dover Street

Your saved contracts

What the buyer wrote

31 Far Gosford street is rented as a shell finish property it is proposed to dryline all internal walls and create stud portioned walls to provide a kitchen space with dry stores attached, two meeting rooms, studio/ multipurpose room, office for 4 members of staff and a disabled toilet to meet the needs of The POD including the relocation of existing kitchen equipment, 2 Dover street is currently occupied by the Coventry and Warwick Primary care trust, and a deed of surrender is in force which sees them vacating the premises at the end of May 2017, 2 Dover street is a locally listed building and requires the downstairs sash windows repairing, re-roofing of two of the bays and replacement of …

Read all of it on Contracts Finder →

Details

What the buyer calls it
COV - Cafe fit out at 31 Far gosford street and replacement sash windows and general maintenance works at 2 Dover Street
How they are buying
Advertised, open to anyoneAny supplier could bid without being invited first.
Type
works
Work starts
23 Jul 2017
Work ends
1 Aug 2017

Who the buyer named

Ronny Tigere was the named contact on this notice.

ronny.tigere@warwickdc.gov.uk