What the buyer wrote
Area 1 Area 1 comprises two cascading earthwork bunds on green space to the north of Back Street. The upper bund has a water storage volume of approximately 1000m3 whilst the lower bund has a water storage volume of approximately 800m3. Flows of surface run-off water will be diverted from the adjacent watercourse into the first bund, where a flow control device will allow a controlled flow into the second bund along a stream channel to the south of the first bund. Another flow control device on the second bund will release a controlled flow of surface run-off into the culvert inlet of the watercourse. The contractor will need to construct a temporary haul/access road to the west of the…
Details
- What the buyer calls it
- CP1456-17 Modbury Flood Risk Management
- How they are buying
- Advertised, open to anyoneAny supplier could bid without being invited first.
- Type
- works
- Suitable for small firms
- The buyer says yes. What that is worth
- Work starts
- 29 Jan 2018
- Work ends
- 2 Nov 2018
Who the buyer named
Miss Eloise Morgan was the named contact on this notice.