CP1473-17 A380 Ware Barton Southbound

Your saved contracts

What the buyer wrote

The A380 is a dual-carriageway and forms part of the main route to Newton Abbot and Torbay from Exeter and the M5. The Ware Barton junction connects the A380 with the A381 Teignmouth Road and the A383 to Kingsteignton. Telegraph Hill is the first part of the A380 from Splatford Split. The Works comprise: Resurfacing and pavement reconstruction, bridge deck waterproofing and joint work, drainage works, vegetation clearance, works to replace vehicle restraint barrier, signing and lining. The procurement was carried out under the Generation 3 Civil Engineering, Highways and Transportation Infrastructure Works Framework Two 2016 to 2020

Bid for this and lost? There is a short window in which the decision can be questioned.

Awarded to

Mildren Construction Limited£1.3mends (23 Mar 2018)

Details

What the buyer calls it
CP1473-17 A380 Ware Barton Southbound
How they are buying
The buyer did not say
Type
works
Work starts
1 Dec 2017
Work ends
23 Mar 2018

Who the buyer named

Mrs Kate Lowman was the named contact on this notice.