Skip to the main content
The Crier

CP1494-17 A361 and A39 North Devon Link Road Geotechnical Investigation

Your saved contracts

What the buyer wrote

This Contract involves the Geotechnical Investigation into the A361 / A39 North Devon Link Road from the Borner's Bridge Junction at South Molton to the Buckleigh Road Junction near Bideford. The ground investigation will comprise the following works: • The excavation of mechanically dug trial pits to a maximum depth of 4m or refusal. • Windowless sample borehole drilled by a dynamic sampling rig to depths as given in the Procurement Documents or refusal on rockhead. This is to include in-situ Standard Penetration Testing (SPT) and undisturbed sampling. Hand-dug starter pits shall be excavated at all exploratory borehole locations. • Combine dynamic sample / rotary open hole / rotary co…

Read all of it on Contracts Finder →

Bid for this and lost? There is a short window in which the decision can be questioned.

Awarded to

Geotechnics Limited£125kends (21 Dec 2018)

Details

What the buyer calls it
CP1494-17 A361 and A39 North Devon Link Road Geotechnical Investigation
How they are buying
Advertised, open to anyoneAny supplier could bid without being invited first.
Type
services
Suitable for small firms
The buyer says yes. What that is worth
Work starts
5 Feb 2018
Work ends
21 Dec 2018

Who the buyer named

Saeed Mirehsan was the named contact on this notice.

saeed.mirehsan@devon.gov.uk