Skip to the main content
The Crier

CSF - Lot 2a Troutbeck Bridge Flood Alleviation

Your saved contracts

What the buyer wrote

Awarded through further competition via Capital shemes Framework re works are located: A591, Troutbeck Bridge, adjacent to Calgarth View. To provide: Detailed activities include wall construction, drainage, and flood gate installation. The Calgarth View, Troutbeck Bridge Drainage Works project will provide protection to the houses on Calgarth View against surface water runoff from Brook Street and the A591 carriageway. The site is directly adjacent to residential properties and the A591.

Bid for this and lost? There is a short window in which the decision can be questioned.

Awarded to

Story Contracting Limited£139.3kends (8 Feb 2019)

Details

What the buyer calls it
CSF - Lot 2a Troutbeck Bridge Flood Alleviation
How they are buying
The buyer did not say
Type
works
Work starts
26 Nov 2018
Work ends
8 Feb 2019

Who the buyer named

Alan Young was the named contact on this notice.

alan.young@cumbria.gov.uk