CSF - Lot 2B - Work Package WPB18E MB Work Package 2018 East
What the buyer wrote
Infrastructure Recovery Programme - Cumbria County Council wishes to appoint suitably qualified and experienced Contractors to undertake the following Work Package: 1 - Work Package WPB18E: This work package is made up of 46# bridges varying in type, however the majority consist of single or multi span stone arch structures on both main and ordinary watercourses. The structures have all been inspected following the December 2015 flood event and work scopes developed by the Council Technical Approval Authority (TAA) that identify the type of damage and elements affected. The Package will be procured by a two stage design and build contract stage 1 design NEC Option C Target Cost activity sche…
Bid for this and lost? There is a short window in which the decision can be questioned.
Awarded to
Details
- What the buyer calls it
- CSF - Lot 2B - Work Package WPB18E MB Work Package 2018 East
- How they are buying
- The buyer did not say
- Type
- works
- Suitable for small firms
- The buyer says yes. What that is worth
- Work starts
- 9 Mar 2018
- Work ends
- 31 Oct 2019
- Kind of work
- New build construction