What the buyer wrote
1 - Work Package WPB18SW: This work package is made up of 49# bridges varying in type, however the majority consist of single or multi span stone arch structures on both main and ordinary watercourses. The structures have all been inspected following the December 2015 flood event and work scopes developed by the Council Technical Approval Authority (TAA) that identify the type of damage and elements affected. The Package will be procured by a two stage design and build contract stage 1 design NEC Option C Target Cost activity schedule, with the stage two build works being awarded at the sole discretion of the client being an NECC Option A fixed price activity schedule contract. This has bee…
Bid for this and lost? There is a short window in which the decision can be questioned.
Awarded to
Details
- What the buyer calls it
- CSF Lot 2B - WPB18SW MB Work Package 2018 Southwest
- How they are buying
- The buyer did not say
- Type
- works
- Suitable for small firms
- The buyer says yes. What that is worth
- Work starts
- 9 Mar 2018
- Work ends
- 31 Oct 2019
- Kind of work
- New build construction
Who the buyer named
Alan Young was the named contact on this notice.
