CSF Lot 2B - WPB18SW MB Work Package 2018 Southwest

Your saved contracts

What the buyer wrote

1 - Work Package WPB18SW: This work package is made up of 49# bridges varying in type, however the majority consist of single or multi span stone arch structures on both main and ordinary watercourses. The structures have all been inspected following the December 2015 flood event and work scopes developed by the Council Technical Approval Authority (TAA) that identify the type of damage and elements affected. The Package will be procured by a two stage design and build contract stage 1 design NEC Option C Target Cost activity schedule, with the stage two build works being awarded at the sole discretion of the client being an NECC Option A fixed price activity schedule contract. This has bee…

Read all of it on Contracts Finder →

Bid for this and lost? There is a short window in which the decision can be questioned.

Awarded to

Jacobs Stobbarts Ltd£1mends (31 Oct 2019)

Details

What the buyer calls it
CSF Lot 2B - WPB18SW MB Work Package 2018 Southwest
How they are buying
The buyer did not say
Type
works
Suitable for small firms
The buyer says yes. What that is worth
Work starts
9 Mar 2018
Work ends
31 Oct 2019

Who the buyer named

Alan Young was the named contact on this notice.