CVRT Final Drive Refurbishment Requirement
What the buyer wrote
The Vehicle Support Team has a requirement to strip, inspect and refurbish circa 700 final drives on the Combat Vehicle Reconnaissance Tracked (CVRT) Mk 1. This requirement will involve inserting new planet carrier assemblies into all drives. Refurbishment of final drives are required to occur on a rolling basis to allow final drives to be cycled through the fleet. A minimum of 20 drives are to be refurbished each month. Refurbishment of final drives will require the Contractor to have the ability to inspect and repair (or replace) final drive components ensuring that they are within specific tolerances. This Contract will be let using the restricted procedure o…
Details
- What the buyer calls it
- CVRT Final Drive Refurbishment Requirement
- How they are buying
- Advertised, shortlist firstSuppliers applied to be considered, and the buyer picked who went on to bid.
- Type
- services
- Suitable for small firms
- The buyer says yes. What that is worth
- Work starts
- 22 Nov 2018
- Work ends
- 22 Nov 2021
Who the buyer named
The buyer published a contact address on this notice.
