Skip to the main content
The Crier

Danesfield School - Block Two AIB Removal

Your saved contracts

What the buyer wrote

1. To strip, remove and dispose of the asbestos insulation board fire break located in the roof space above block two. Access to be gained by opening up the ceiling to the lobby area and the music room store so as to gain safe and reasonable access. To include the removal and disposal of all the associated contaminated loft insulation. To vacuum, decontaminate and prepare for 4 stage clearance testing. 2. To supply and install 12.5mm fireline plasterboard to replace the firebreak removed in item 1 above. To seal all gaps using intumescent mastic sealant. 3. Also to supply and install new 200mm MMMF loft insulation to replace that removed. 4. To supply and install 12.5mm plasterboard to re…

Read all of it on Contracts Finder →

Bid for this and lost? There is a short window in which the decision can be questioned.

Awarded to

Scancross£24kends (30 Aug 2019)

Details

What the buyer calls it
Danesfield School - Block Two AIB Removal
How they are buying
Advertised, shortlist firstSuppliers applied to be considered, and the buyer picked who went on to bid.
Type
works
Suitable for small firms
The buyer says yes. What that is worth
Work starts
28 Jul 2019
Work ends
30 Aug 2019

Who the buyer named

Mr Chris Pethick was the named contact on this notice.

clester@buckscc.gov.uk