Data Centre Transfer
What the buyer wrote
The requirement to build a fit for purpose data centre. Within scope and expected outcomes: Change type of existing room/space/building within a current WYFRS location into a functioning data centre. This should include but not limited to the following, building works including refurbishment covering all aspects of a business environment. The site will have the ability to include- Aircon, UPS, generator, electrical, flooring and ceiling. Be able to make good, and complete the data centre install with standardised racking, forced air cooling or equivalent for efficiency. Turning an existing space into a small data centre housing at least 6 racks.
Bid for this and lost? There is a short window in which the decision can be questioned.
Details
- What the buyer calls it
- Data Centre Transfer
- How they are buying
- Given to one supplier, no competitionNobody else was asked, and the buyer has to be able to justify that.
- Work starts
- 24 Mar 2025
- Work ends
- 24 Mar 2026
- Where
- in Yorkshire and The Humber
Who the buyer named
The buyer published a contact address on this notice.