What the buyer wrote
All structural interventions, modifications and demolition as detailed in Price & Myers, Witherford Watson Mann and Purcell design drawings; Demolition of Strand floor, facade, and other elements as specified by the design engineers; Survey and investigation works required to ensure design and methodology is completed in time within the restraints of the existing structure; Localised noise, dust and vibration monitoring; Clean and re-use of existing brickwork for new wall installs; Formation of new floors including padstones or steel bearing plates, steels, joisting and sheathing; Formation and infills to all pockets formed for new structure install, both for this package and other (i.e. Str…
Bid for this and lost? There is a short window in which the decision can be questioned.
Awarded to
Details
- What the buyer calls it
- Demolition & Structural Alterations
- How they are buying
- Advertised, open to anyoneAny supplier could bid without being invited first.
- Work starts
- 2 Oct 2026
- Work ends
- 8 Nov 2027
- Where
- in London
Who the buyer named
The buyer published a contact address on this notice.
