Design and Build of NCHP

Your saved contracts

What the buyer wrote

The National Centre for Healthcare Photonics will provide well serviced, offices, and flexible areas for process, analytical and technology development, small scale production areas and process demonstration and pre manufacturing requirements.

Bid for this and lost? There is a short window in which the decision can be questioned.

Awarded to

Surgo Construction Ltd£4.2mends (31 Dec 2018)

Details

What the buyer calls it
Design and Build of NCHP
How they are buying
Advertised, shortlist firstSuppliers applied to be considered, and the buyer picked who went on to bid.
Type
works
Suitable for small firms
The buyer says yes. What that is worth
Work starts
31 Aug 2017
Work ends
31 Dec 2018

Who the buyer named

David Cooper was the named contact on this notice.