Design and Build of Shaft & Silo Waste Transfer Corridor
What the buyer wrote
The Transfer Corridor plant and equipment provide critical infrastructure to support the safe and efficient operation, and capability, of the future main construction works at the Transfer Corridor and wider Shaft and Silo programme. Scope consists of: - Maturation of scheme design to final design, - Manufacture of the Plant and Equipment - Factory Acceptance Testing (FAT) - Creation of supplementary operational and maintenance documentation - Delivery of the final manufactured and assured Plant and Equipment - Possible Storage solutions either within contractual timescales or within the plus one-year arrangement
Details
- What the buyer calls it
- Design and Build of Shaft & Silo Waste Transfer Corridor
- How they are buying
- Advertised, then negotiatedThe buyer talked terms with bidders rather than taking fixed offers.
- Type
- services
- Where
- in Scotland, in the North West
- Kind of work
- New build construction
Asking a question
Sarah Brown is the named contact on this notice. Questions closed on 9 Oct 2026, 23:59 BST.
Above threshold you will be asked for a PPON and a share code when you bid. Getting one takes about half an hour, once.
