Design and build: Replacement of pond dipping platforms and bridge at Daventry Country Park NN11 2JB
What the buyer wrote
Platforms: The pond dipping area is currently unusable for health and safety reasons as the existing platforms are in a bad state of repair and need replacing. There pond will need to be cleared and both replacement platforms will require increase access for pushchair and wheelchair users so as to ensure safe use for visitors. Bridge: The bridge which goes across a jetty to a bird viewing site is currently unusable for health and safety reasons as it has collapsed and needs replacing. Both structures to be built out of wood A budget of circa £25,000 has been set aside for these two projects although the pond dipping platforms has the highest priority. The contract will commence in…
Bid for this and lost? There is a short window in which the decision can be questioned.
Awarded to
Details
- What the buyer calls it
- Design and build: Replacement of pond dipping platforms and bridge at Daventry Country Park NN11 2JB
- How they are buying
- Advertised, open to anyoneAny supplier could bid without being invited first.
- Type
- goods
- Suitable for small firms
- The buyer says yes. What that is worth
- Work starts
- 13 Jul 2017
- Work ends
- 30 Sep 2017
- Kind of work
- New build construction, Civil engineering and groundworks
Who the buyer named
Richard Stirling was the named contact on this notice.