Design and Build Works for Mains Sewer Connection at High Lodge
Forestry CommissionSouth West
What the buyer wrote
Connection of High Lodge Forest Centre to the mains sewer, approximately 2.4 km from the current discharge point. A Section 106 agreement with Anglian Water is already in place, and a preferred route for the connection has been identified.
Bid for this and lost? There is a short window in which the decision can be questioned.
Awarded to
Details
- What the buyer calls it
- Design and Build Works for Mains Sewer Connection at High Lodge
- How they are buying
- Advertised, open to anyoneAny supplier could bid without being invited first.
- Where
- in the South West
Who the buyer named
Nina M Menichino was the named contact on this notice.
