Skip to the main content
The Crier

Design and Build Works for Mains Sewer Connection at High Lodge

Your saved contracts

What the buyer wrote

Connection of High Lodge Forest Centre to the mains sewer, approximately 2.4 km from the current discharge point. A Section 106 agreement with Anglian Water is already in place, and a preferred route for the connection has been identified.

Bid for this and lost? There is a short window in which the decision can be questioned.

Details

What the buyer calls it
Design and Build Works for Mains Sewer Connection at High Lodge
How they are buying
Advertised, open to anyoneAny supplier could bid without being invited first.
Where
in the South West

Who the buyer named

Nina M Menichino was the named contact on this notice.

nina.menichino@forestrycommission.gov.uk