Design and construction of a new metal footbridge, suitable for foot and cycle traffic (2)
Tewkesbury Borough CouncilSouth West
What the buyer wrote
The Employer requires: • Dismantling and safe off-site disposal of the existing footbridge • Design and construction of a new metal footbridge, suitable for foot and cycle traffic • Installation of a temporary bridge to maintain uninterrupted access during works • Compliance with details set out in Preliminaries, Pricing Schedule, Health & Safety Plan, Site Plan, Structural Report.
Bid for this and lost? There is a short window in which the decision can be questioned.
Awarded to
Details
- What the buyer calls it
- Design and construction of a new metal footbridge, suitable for foot and cycle traffic (2)
- How they are buying
- Advertised, open to anyoneAny supplier could bid without being invited first.
- Where
- in the South West
- Kind of work
- New build construction, Civil engineering and groundworks
Who the buyer named
Heather Birch was the named contact on this notice.
