Design and Installation of Event Duration Monitors and Flow Monitoring at Thames Water's Sewage Treatment Works
What the buyer wrote
Provision of MCERTS Event Duration Monitors (EDMs) (U_MON3 driver) to detect start and stop times of overflows to storm tanks, off-line storage, on-line storage, land treatment area or direct to the environment. Provision of MCERTS pass forward flow (PFF) monitors (U_MON4 Driver). The solutions can involve the condition assessment and modification of pre-existing installations to meet the MCERTS standard, or the first-time installation of a PFF instruments. Provision MCERTS flow monitoring for the first time flow (U_MON5) where permitted DWF or maximum daily flow is greater than 50m3/d at sewage treatment works (STWs). Installations may require a degree of civils work as part of the installa…
Bid for this and lost? There is a short window in which the decision can be questioned.
Awarded to
Details
- What the buyer calls it
- Design and Installation of Event Duration Monitors and Flow Monitoring at Thames Water's Sewage Treatment Works
- How they are buying
- Advertised, then negotiatedThe buyer talked terms with bidders rather than taking fixed offers.
- Type
- works
- Framework
- Yes: joining it lets you bid for call-offs without a new tender each time
- Where
- in London, in the South East
Who the buyer named
The buyer published a contact address on this notice.
