Skip to the main content
The Crier

Design & Build of an Academic Building and associated Public Realm

Your saved contracts

What the buyer wrote

The University of Brighton wishes to procure the design and build of a new academic building which is to be located on the site of an existing surface car park located adjacent to existing academic buildings and also adjacent to a new proposed multi storey car park (to be constructed shortly before the academic building). The proposed academic building will provide 7082sqM of floor area (GIA) over 6 floors with plant and an atriumoverrun at roof level for the fully glazed skylight. The form of the building is broadly in two parallel wings with afull height atrium separating them. The scheme will be designed up to RIBA Stage 4 as described above. It is the…

Read all of it on Contracts Finder →

Details

What the buyer calls it
Design & Build of an Academic Building and associated Public Realm
How they are buying
Advertised, shortlist firstSuppliers applied to be considered, and the buyer picked who went on to bid.
Type
works
Work starts
1 Jan 2019
Work ends
1 Aug 2020

Who the buyer named

Samantha Mills (GBC) was the named contact on this notice.

Samantha.Mills@guildford.gov.uk