Skip to the main content
The Crier

Design Code Scope for Cottingwood Phases 2b, 3 and 4.

Your saved contracts

What the buyer wrote

HE requires a Design Code to be prepared specifically for Phase 2b, 3 and 4 (parcels 2b, 3a, 3b, 4a and 4b). . The Design Code will be required to: •Comply with the requirements of Condition 15 (set out in appendix 1) as it will be submitted to the LPD for approval to discharge this condition. •Support the evaluation criteria for design. •Align with the National Model Design Code Guidance •Comply with and expand upon the parameters set out in the site wide Design Code. •Provide a detailed stipulations and guidance on the form of development at a street, block and plot level. •Consider future access arrangements to the Michie land to the south of parcel 2a and the Dungait land to the north of…

Read all of it on Find a Tender →

Bid for this and lost? There is a short window in which the decision can be questioned.

Details

What the buyer calls it
Design Code Scope for Cottingwood Phases 2b, 3 and 4.
How they are buying
Given to one supplier, no competitionNobody else was asked, and the buyer has to be able to justify that.
Where
in the North East

Who the buyer named

The buyer published a contact address on this notice.

etendering@homesengland.gov.uk