Design, construction and installation of new shop at Rievaulx Abbey
What the buyer wrote
To design the shop layout within the brief given by English Heritage Contract Manager (Martin Wright), to manufacture off Site and install at Rievaulx Abbey between 16th May 2016 to 20th May (A maximum of 5 days installation allowed). The following scope of work is included: • Work with main contractor at Site and the English Heritage Contract Manager, to ensure project delivered on time and within budget. • Design shop layout to brief, following English Heritage shop fit out policy • Attend design meetings and installation meetings as required. • Visit Site to take final measurements before manufacture – make any other site visits as required. • Provide samples of raw materials to b…
Details
- What the buyer calls it
- Design, construction and installation of new shop at Rievaulx Abbey
- How they are buying
- Advertised, open to anyoneAny supplier could bid without being invited first.
- Type
- services
- Suitable for small firms
- The buyer says yes. What that is worth
- Work starts
- 21 Dec 2015
- Work ends
- 27 May 2016
Who the buyer named
Matthew McKeown was the named contact on this notice.
