Skip to the main content
The Crier

Design & Construction of a Solar Canopy for the GULCS Project

Your saved contracts

What the buyer wrote

South Gloucestershire is installing a flagship Electric Vehicle Go Ultra Low Charging Station (GULCS). The GULCS will provide up to eight rapid charging bays and will be located at the Bristol and Bath Science Park on Feynman Way, South Gloucestershire.This contract is for the design, manufacture, installation and maintenance of a solar canopy for the GULCS. The appointed contractor shall demonstrate experience of designing, planning, scheduling, constructing and maintaining solar canopies, with good experience/knowledge of working with local authorities.

Bid for this and lost? There is a short window in which the decision can be questioned.

Awarded to

Polysolar Limited£200kends (28 Aug 2020)

Details

What the buyer calls it
Design & Construction of a Solar Canopy for the GULCS Project
How they are buying
Advertised, open to anyoneAny supplier could bid without being invited first.
Type
works
Suitable for small firms
The buyer says yes. What that is worth
Work starts
16 Jan 2020
Work ends
28 Aug 2020

Who the buyer named

Wayne Matthews was the named contact on this notice.

wayne.matthews@southglos.gov.uk