Design & Construction of a Solar Canopy for the GULCS Project
What the buyer wrote
South Gloucestershire is installing a flagship Electric Vehicle Go Ultra Low Charging Station (GULCS). The GULCS will provide up to eight rapid charging bays and will be located at the Bristol and Bath Science Park on Feynman Way, South Gloucestershire.This contract is for the design, manufacture, installation and maintenance of a solar canopy for the GULCS. The appointed contractor shall demonstrate experience of designing, planning, scheduling, constructing and maintaining solar canopies, with good experience/knowledge of working with local authorities.
Bid for this and lost? There is a short window in which the decision can be questioned.
Awarded to
Details
- What the buyer calls it
- Design & Construction of a Solar Canopy for the GULCS Project
- How they are buying
- Advertised, open to anyoneAny supplier could bid without being invited first.
- Type
- works
- Suitable for small firms
- The buyer says yes. What that is worth
- Work starts
- 16 Jan 2020
- Work ends
- 28 Aug 2020
Who the buyer named
Wayne Matthews was the named contact on this notice.
