Skip to the main content
The Crier

Design for Longevity- Electrolyser Prototype Design

Your saved contracts

What the buyer wrote

The STEP Fuel Cycle is the subsystem responsible for recovering, purifying and supplying tritium to the STEP fusion reactor. Tritium is present in a variety of forms, phases and compositions, including tritiated water. Vapour-phase electrolysis techniques such as solid-oxide electrolysis have been identified as a suitable technique for processing small quantities of tritiated water. The scope is to deliver the conceptual design of an electrolyser system (electrochemical cell or stack). This includes, but is not limited to, components of the electrolyser: electrolytes, electrodes, interconnects, separators, electrical connections, vessels, structural components, seals, gaskets, heating elemen…

Read all of it on Find a Tender →

Bid for this and lost? There is a short window in which the decision can be questioned.

Awarded to

AqSorption Limited£120kends (31 Mar 2027)

Details

What the buyer calls it
Design for Longevity- Electrolyser Prototype Design
How they are buying
Advertised, open to anyoneAny supplier could bid without being invited first.
Work starts
27 Sep 2026
Work ends
31 Mar 2027
Where
in the South East

Who the buyer named

Operational Procurement was the named contact on this notice.

operationalprocurement.step@ukifs.uk