Skip to the main content
The Crier

Design, Manufacture and Supply of a Tube Furnace and Control System

Your saved contracts

What the buyer wrote

NNL require a Vertical Tube Furnace and Control System to be used for the PAPA project. A Procurement Specification reference BEIS10951/06/31/01, has been included to define and outline the key functional requirements for the design, manufacturing, testing, supply and delivery of the Tube Furnace and Control System. The scope of supply must be fully compliant which is detailed as per the Procurement Specification and the Contract Quality Requirements for Quality Grade 03.

Details

What the buyer calls it
Design, Manufacture and Supply of a Tube Furnace and Control System
How they are buying
Advertised, open to anyoneAny supplier could bid without being invited first.
Type
goods
Suitable for small firms
The buyer says yes. What that is worth
Work starts
4 Jan 2021
Work ends
31 Mar 2021

Who the buyer named

Emma Pritt was the named contact on this notice.

Emma.pritt@sellafieldsites.com