Skip to the main content
The Crier

Design of an Energy Storage System and Electrical & Control System of Integration of All Other Drive System

Your saved contracts

What the buyer wrote

The University of Warwick, Warwick Manufacturing Group, has a requirement for a detailed design for a suitable energy storage system and for the design of the electrical & control integration of all other drive system components, relating to a project involving the design of a self-contained series-hybrid drive system for a railcar bogie. Please refer to http://in-tendhost.co.uk/universityofwarwick for further information. You will be able to download the full tender documents from this site. Any queries in relation to this requirement should be directed to the University of Warwick via the correspondence functionality of our e-tendering system. Failure to do so may result in queries bei…

Read all of it on Contracts Finder →

Details

What the buyer calls it
Design of an Energy Storage System and Electrical & Control System of Integration of All Other Drive System
How they are buying
Advertised, open to anyoneAny supplier could bid without being invited first.
Type
goods
Work starts
18 Oct 2015
Work ends
19 Oct 2016

Who the buyer named

Ann-Marie Cooper was the named contact on this notice.

a-m.o.cooper@warwick.ac.uk