Design, Supply, Refurbishment and Installation of Town Dock Torquay
What the buyer wrote
Six of the existing pontoons that form the wave screen for the marina need to be rubberised as the joints have become worn. This will require them to be removed from site for shot blasting and metal works. While they are off site a temporary wave screen will need to be put in place to protect the marina. The access bridge to the marina also needs to be refurbished, this will also need to be taken off site for blasting and minor metal works. Temporary access will need to be put in place while the bridge is being refurbished. The back walkway pontoon and three legs of the marina, along with all the mooring fingers need to be removed and replaced with new products. The existing utility supplies…
Bid for this and lost? There is a short window in which the decision can be questioned.
Awarded to
Details
- What the buyer calls it
- Design, Supply, Refurbishment and Installation of Town Dock Torquay
- How they are buying
- Advertised, open to anyoneAny supplier could bid without being invited first.
- Type
- goods
- Where
- in the South West
Who the buyer named
Mrs Joanna Pascoe was the named contact on this notice.
