Disraeli School - Boiler Room Decontamination
What the buyer wrote
To wire brush and scrape the walls of the boiler room to remove the residual asbestos insulation that has been located. To report back any requirement for encapsulation. To strip, remove and dispose of any associated contaminated MMMF material. To scrape, vacuum and decontaminate the sump duct areas. To vacuum, decontaminate and prepare for air testing.
Bid for this and lost? There is a short window in which the decision can be questioned.
Awarded to
Details
- What the buyer calls it
- Disraeli School - Boiler Room Decontamination
- How they are buying
- Advertised, shortlist firstSuppliers applied to be considered, and the buyer picked who went on to bid.
- Type
- works
- Suitable for small firms
- The buyer says yes. What that is worth
- Work starts
- 30 Sep 2018
- Work ends
- 31 Oct 2018
Who the buyer named
FAO Adrian Ratcliff was the named contact on this notice.
