Skip to the main content
The Crier

Ditching Works of a Watercourse/Dyke

Your saved contracts

What the buyer wrote

Doncaster Council Flood Risk Team look to appoint a contractor to maintain watercourse and dykes within the Doncaster Area. This tender will allow us to use a framework to carry out any ditching or associated works with a watercourse, dyke or highway ditch where required. • These works are required to ensure the flow of water through watercourses and mitigate flood risk to Doncaster. • The works are generally of minor / short duration in nature.

Details

What the buyer calls it
Ditching Works of a Watercourse/Dyke
How they are buying
Advertised, open to anyoneAny supplier could bid without being invited first.
Type
works
Suitable for small firms
The buyer says yes. What that is worth
Work starts
13 Jan 2020
Work ends
12 Jan 2024

Who the buyer named

Miss Hayley Donnellan was the named contact on this notice.

hayley.donnellan@doncaster.gov.uk